логотип ЭЗТМ

© 2006 OAO «ЭЗТМ»
Телефон (09657)7-75-22 Телефон/факс (09657)7-81-55 E-mail: eztm@eztm.ru

History

April 13,  1942 - the works was founded by decision of the State Committee of Defense

July, 1942 - the first product was manufactured

July 11, 1945 - the works was awarded to Order of LeninГрамоата о награждение Орденом Ленина

1945 - serial production of plate feeders has begun (more than 3000 feeders have been manufactured)

1948 - the first electric-weld tube plant was manufactured (over 80 plants have been manufactured)

1950 - production of blades for hydroturbines has begun. All turbines of home power stations are equipped with blades under EZTM brand (over 700 blades have been manufactured). Production of oil film bearings, section mills, forge manipulators and crushing equipment has begun.

1952 - the 40-160 tube-rolling plant for production of ball bearing tubes was put into operation (Pervouralsk);

   - the unique oil film bearing was manufactured, the works' specialists were awarded with the State Prize of the USSRПервый пластинчатый питатель

1953 - the first 650 electric-weld tube plant for production of spiral welded tubes was put into operation (Mariupol)

1955 - the first 820 electric-weld tube mill for production of gas pipelines was put into operation (Chelyabinsk)

1956 - production of ball-rolling mills has begun

1958 – production of cold-rolling tube has begun

February 8, 1963 – according to the decision of the Council of Ministers the works specialized in production of tube, light section and special mills

1963 - the plant of continuous lap-welding tube was put into operation (Chelyabinsk). The designers were awarded with the Lenin Prize of the USSRПервая клеть Дуо

1966 – inventions were patented abroad for the first time (USA, Germany, Great Britain)

1967 - rated output of the 30-102 tube-rolling plant was achieved (Pervouralsk). The works' specialists were awarded with the State Prize of the USSR

1968 - gas pipelines of 1120 mm diameter were manufactured in the 1020-1220 electric-weld tube mill.

       - the 100th cold tube-rolling mill was manufactured; development engineers were awarded with the State Prize of the USSR.

1971 - the 20 000th oil film bearing and 2000th hot-blast valve for blast furnaces were manufactured.

1972 - the works' specialists were awarded with the State Prize of the USSR for production of a range of cross-rolling mills

1974 - the largest tube electric welding plant for production of  tubes of 1620 mm diameter was put into operation (Khartsizsk)

1976 - the 3/8"-1" continuous butt-welding plant was put into operation (Taganrog); its designers were awarded with the State Prize of the USSRПервая клеть трубосварочного стана

1978 - the first rolled axis for railway transport was manufactured in the equipment designed by the EZTM together with VNIIMETMASH (Dneprodzerzhinsk). The designers were awarded to the State Prize of the USSR

1979 - production of seamless tubes in semi-continuous plants has begun. The plants were put into operation in Kamensk-Uralski and in Dnepropetrovsk. The equipment designers were awarded with the State Prize of the USSR.

          - serial production of toothed couplings has begun.

1982 - specialists of EZTM and VNIIMETMASH were awarded with the State Prize of the USSR for design and manufacture of automatic ball-rolling mills

1983 - complex of machines for production of economic oil-gas pipelines with diameter up to 530 mm was designed and put into operation. Its designers were awarded to the State Prize of the USSR.

 - tube electric welding mill for production of aluminum tubes was designed. Its designers were awarded with the Prize of the Council of Ministers of the USSR.

1986 - the ТПА-80 tube-rolling plant was put into operation in Sinarsky Pipe Works. Hot rolling of small diameter tubes was performed in it for the first time.

1988 - the plant for production of vessels was put into operation (Mariupol Illich Iron & Steel Works).

 - the 700 medium section mill was designed and delivered to Nigeria;

 - the 160 universal cold-rolling tube mill was designed and delivered to Chelyabinsk;

since 1991 – it has been designed and delivered:

the 400 medium section beam-rolling mill (Norway);
the 1020 electric-weld tube plant (Vyksa Steel Works);
the special sizing mill (Czechia);
the 25-114 electric-weld tube plant (Bulgaria);
series of cold-rolling tube mills (India);
the 15-50M electric-weld tube plant (Brasilia)

4 unique cold-rolling mills for production of stainless large diameter tubes (China)

In February 1998 - bearing ring rolling plant was successfully put into operation at "Timken" (USA).

          - the 40-80 ball-rolling mill was put into operation (Uzbekistan)

          - the 20-60 ball-rolling mill was put into operation (Germany and India)

1999 - three exit sides of piercing mills for "Timken" (USA) were reconstructed.

2002 - power wire production line for Klyuchevskoy Ferro-Alloys Plant, Sverdlovsk region, was manufactured and put into operation.

2003 - standard range of quickchangeable constricting devices (QCD 100, 150, 200, 300, 400, 700) for enterprises of gas industry was developed and manufactured. The Konstantinovsky Palace - Palace of Congress (St. Petersburg) was one of the sites where QCD 200, 300 was derived to.

2004 – the quality management system in the field of "design and manufacture of oil film bearings for rolling mills and gear couplings" was certificated by Britain Standard Institute (BSI). Certificate # FM 90597 was given.

 - a contractor design of reconstruction of the 1020 tube electric welding plant had been completed and the first set of equipment was manufactured (Vyksa Steel Works). The aim of the reconstruction was to produce tubes 1420 mm diameter.

 - the 60-160 cold rolling mill for NFC (India) was designed and manufactured. The problem of production of round and square tubes from billets with the diameter more than 120 mm was solved for the first time.

2005 - the quality management system in the field of "Design, manufacture and maintenance of rolling, blast furnace and mining equipment and their spare parts including oil film bearings for rolling mills and gear couplings" was certificated by Britain Standard Institute (BSI).

 - the first set of the equipment for Vyksa Steel Works was put into operation. The second set of the equipment of the 1020 tube electric welding plant was designed and manufactured. An assembly-welding mill, a mill for outer and inner welding and tube testing and repairing equipment were designed and manufactured by EZTM JSC in the frames of the delivery contract of the third set of the equipment.

 - the 40-8 cold rolling mill with drive vertical arrangement was designed and manufactured (Ukraine). It allowed to increase speed of the mill.

 - the unique equipment of a piercing mill for was designed and manufactured (Seversky Tube Works).

 - manufacture of a reduction mill has begun (Sinarsky Pipe Works). This mill allowed to reduce diameter of a billet made by steel continuous casting plant from 156 mm to 120-130 mm.

 - modernization of the 2-40Б cold rolling mill has begun.

 - representations of EZTM JSC in Singapore and Ukraine were opened.

2006

- Representative offices of "EZTM" JSC in UK and India were opened.

- Agreement on manufacture and delivery of equipment for modernization of reducing mill and cooling bed for TПA-80 line was executed with "Dnepropetrovsk Tube Works" JSC.

- Agreement on manufacture and delivery of rotary cement kiln was executed with PRUP "Krichevtsementnoshifer", Belarus.

- Agreement on manufacture and delivery of equipment for modernization of ТПА-50-200 mill, two 3-roll stands of reeling mill and equipment of sizing mill was executed with "Volzhsky Tube Works" JSC.   

- Agreement on manufacture and delivery of sizing mill equipment was executed with "Sinara Tube Works" JSC.

- Agreement on manufacture and delivery of sizing mill equipment was executed with "Taganrog Metallurgical Plant" JSC.

- Agreement on modernization of ТПА-140 for "Izhora Tube Company" was executed with "Industrial Investment Company" Ltd.

- Agreement on manufacture and delivery of a reloader was executed with "Seversky Tube Works" JSC.

- "Tandem 1000" mill equipment for "Kirov Non-Ferrous Metal Processing Plant" JSC was designed and manufactured jointly with VNIIMETMASH.

- ХПТ 40-5 mill was launched into production.

- New КГД 1100 hot blast valve was designed.

- The quality management system of "EZTM" JSC was certified by external auditors of Britain Standard Institute (BSI) confirming compliance to BS EN ISO 9001:2000 (Periodical appraisal No. 2).

- "EZTM" JSC, Graebener Maschinentechnik GmbH & Co KG (Deutschland) and Fontijne Grotnes BV (The Netherlands) signed a protocol on cooperation in the field of design and supply of tube welding works equipment set for production of longitudinal welded tubes of large diameter. "EZTM" JSC was a general contractor and supplier of tube welding works equipment set in Russia and abroad under the protocol.  

2007

- "EZTM" JSC celebrated its 65 anniversary.

- "EZTM" JSC was entitled as "Russian Company of high social efficiency".

- "400" piercing mill designed and manufactures by "EZTM" JSC in 2006 was put into service at "Seversky Tube Works" JSC.

- 3-roll stand of reeling mill was manufactured and supplied to "Volzhsky Tube Works" JSC.

- Sizing mill equipment was manufactured and supplied to "Volzhsky Tube Works" JSC.

- Sizing mill equipment was manufactured for "Sinara Tube Works" JSC.  

- Sizing mill equipment was manufactured for "Taganrog Metallurgical Works" JSC.

- Equipment for ТПА 50-200 mill reconstruction was manufactured and supplied to "Volzhsky Tube Works" JSC.  

- Equipment for reconstruction of ТПА-80 mill and cooling bad was manufactured for "Dnepropetrovsk Tube Works" JSC.  

- Agreement on production of ТПА-200 breakdown mill equipment was executed with  TMC-ArtRom"(Rumania).

- Rotary cement kiln equipment was manufactured for PRUP "Krichevtsementnoshifer" (Belarus).   

2008

- The quality management system of "EZTM" JSC was certified by external auditors of Britain Standard Institute (BSI) confirming compliance to BS EN ISO 9001:2000.

- "EZTM" JSC was certified as a hot and cold rolls supplier of "TMC" JSC by "RosNITI" JSC auditors.

- The first stage of preparation for company environment security system development corresponding to ISO 14001 took place.

- ТПА 200 breakdown mill was manufactured and supplied to "TNC-ArtRom", Romania. 

- Agreement on manufacture and supply of ХПТ 350-8 cold rolling mill was executed with TISCO, China.

- Equipment of assembling-welding mill No.1 and No.4 was manufactured and installed at "Chelyabinsk Tube Rolling Plant".

- Piercing mill for production of casing and oil-well tubing was manufactured and supplied to "Vyksa Metallurgical Plant" JSC.

- Agreement on manufacture and supply of a floor-charging machine was executed with VMZ "Krasny Oktyabr" ZAO.   

- Agreement on supply of draw bridge equipment was executed with "Rostovavtomost" JSC. 

- New hot blast valve 1100 of cowper stove was designed and manufactured for "Seversal" JSC.  

- New hydrostatodynamic oil film bearings were mounted and put into operation in SMS Demag reversing cold rolling mill operating at "MMK" JSC.  

- Spare parts for general overhaul of tube rolling shop No. 4 at "Interpipe NTZ" JSC were supplied.

- Apron feeders were manufactured and supplied to mining and processing enterprise "Erdenet", Mongolia.    

- Jaw crusher ЩДС 12х15-Ф with complex jaw movement was designed and manufactured for "Orsk Kareroupravlenie" JSC.  

- Titanium sponge crusher for titanium sponge processing line was designed.

2009

-  Contract on manufacture and supply of four crushers for processing of titanium sponge was singed with "Yunnan Metallurgical Group" (China).

-  Shopfloor assembly of eight crushers for processing of titanium sponge under terms of a contract concluded between "EZTM" JSC and "Pangang Group Titanium Industry Corp. Ltd", China, was completed.

-  Equipment of a sizing mill manufactured by "EZTM" JSC and supplied to "Taganrog Metallurgical Plant" JSC successfully passed performance tests and reached its guaranteed performance.

-  Mechanical equipment intended for opening of spans of the bridge over Don River in Rostov region was manufactured and supplied under an agreement between "EZTM" JSC and "Rostovavtomost" JSC.

-  Steel grades increasing wear resistance of rolls were used in production.

-  An orbital step-up gear for a generator of wind-driven power plant ВЭУ-1,5 with capacity of 1500 kW was designed.

-  A representative office of "EZTM" JSC was opened in China.

-  Quality management system of "EZTM" JSC was certified to be in conformance with ISO 9001:2008 by BSI.

-  Equipment of a cold rolling mill ХПТ – 350 was manufactured and supplied to «TISCO» (China).

-  Mechanical equipment and automation systems for modernization of a cold rolling mill ХПТ-55 were supplied to “Mashinostroitelny Zavod” (OAO MSZ), Electorstal city, Russia

-  The following projects were implemented as a part of a modernization program of the procurement division:

  •  a steam-power press installed in a press-forging shop was replaced by a forging complex based on a 3000 press and a manipulator with capacity of 35 ton
  •  two heat treatment furnaces "Bosio", Slovenia, were put into operation in Machine Assembly Department No. 2
  • a reheating furnace "Bosio", Slovenia, was put into operation in the press-forging shop
  • a gas furnace "Bosio", Slovenia, for cementation of tooth gears with diameter of ≤1200 mm and weight of ≤ 1700 kg was put into operation